Scaffolding built around your solar installation workflow
We partner directly with commercial and domestic solar PV contractors across the South East. Every scaffold is planned to keep your roof teams safe, speed up panel loading, and strike promptly once commissioning wraps.
Gutter-clearance handrails
Configured to leave guttering and roof tiles fully accessible so your brackets and array fixings fit without scaffold interference.
Unobstructed eaves lifts
Working platforms built precisely below the eaves line to give installers comfortable working height across the entire lower array.
Dedicated material hoist towers
Integrated lifting bays and gin wheels designed specifically for hoisting solar PV panels and ballast safely up to roof level.
Synchronised strike schedules
Reliable dismantle scheduling matched directly to your commissioning timelines, preventing idle scaffolding on client driveways.
Installer Operational Standard
TG20:21 compliant compliance certificates on every handover
Handover packs, scaffolding tags, and weekly inspection logs supplied digitally for your principal contractor compliance folders.
Planning a residential or commercial solar rollout?
Send your site plan or schedule for fixed-rate installer pricing.
Scaffolding engineered around your solar installation timeline.
PV mounting teams need precise edge protection, clear panel lift access, and scaffolds that come down promptly when the job is done. We deliver dependable operational support across Berkshire, Surrey, Hampshire, Buckinghamshire, and London.
How we work alongside your installation crews
A structured four-step process ensuring zero site hold-ups, compliant handover paperwork, and direct scaffolder-to-electrician coordination.
Schedule & load planning
You share your PV rollout dates. We verify roof eaves heights, gutter clearances, and designate panel loading zones on the deck.
Compliant erection
Our qualified scaffolders build safe roof-edge handrails, hop-up platforms, and hoist points strictly aligned with NASC TG20 standards.
Installer handover & green tag
We sign off the handover certificate, hand the site to your electrical crew, and remain on call for any platform adjustments.
Priority strike & clear site
Once panels and commissioning tests are complete, we strike the framework promptly to maintain your customer satisfaction.
Scaffolding built for solar installers.
Plan your next installation with dedicated access designed around panel handling, safe roof transitions, and strict handover dates.
Designed for panel lifting clearance and smooth roof-level workflows.
Prompt dismantling scheduled as soon as PV commissioning is signed off.
Handover certificates, TG20 compliance sheets, and site inspection logs.
Safety & Compliance Standards
Start your solar quote
Send site drawings, roof plans, or project specifications for a clear, itemised quotation.
Operating hours: Monday to Friday, 8am – 6pm
Covering Berkshire, Surrey, Hampshire, Buckinghamshire, London, and the South East.